Update Cost and Lead Time from Inventory

Explanation

Use the right mouse button menu option Update Cost and Lead Time to copy Costing data for all revisions of the part that are not obsolete (if Costing data is not defined, data from Inventory is used). This menu option is only available if IFS Inventory is installed. The data retrieved is:

Cost set is defined in Costing and all the cost sets must have been calculated. Important tips is to use right template for the cost set. Cost set 1 can not be calculated, and must be copied from another cost set. For manufactured parts the structure in Manufacturing Standard will be used. This structure may be transferred from the engineering part revision's structure, see Engineering Revision Transfers for more information.

A sum of Labor and Machine Hours on the defined operations will be fetched from Routings in Manufacturing Standard, in addition to Cost and Lead Time. See Routing/Routings for more information. 

Prerequisites

System Effects

These data will be used when running Roll Up Cost Calculation.  

Window

Engineering Part Revision

Related Window Descriptions

Engineering Part Revision/Revision
Engineering Part Revision/Additional
Inventory Part
Part Cost
Engineering Revision Transfers
Routing/Routings

Procedure

  1. Select the part for which you want to update the information.
  2. Select the Update Cost and Lead Time menu option.
  3. In the appearing dialog box, select if you want to perform the calculation in batch.