Change CAMRO Interim Order Dates

Explanation

Use this activity to manually change the start and supply dates of any type of maintenance, repair and overhaul (MRO) interim order.

Prerequisites

The interim order cannot be in a Canceled or Closed state.

System Effects

N/A

Window

CAMRO Interim Order Structure

Related Window Descriptions

CAMRO Interim Order Structure

Procedure

  1. From the Interim Header ID list, select the interim order structure that contains the interim order for which you want to change the dates.
  2. Open the Tree Structure tab and select the appropriate interim order. Verify that the state of this interim order is not Canceled or Closed.
  3. Click the Detail tab in the Tree Structure tab and change the start or supply dates as needed.
  4. Save the record.