Enter Posting Control Information For Capitalize Expenses

Explanation

Use this activity to enter posting types and control types for the project type Capitalize Expenses.

Prerequisites

Before the posting control for capitalize expenses projects can be entered, the following must have been completed:

System Effects

As a result of this activity, the updating routine creates capitalization transactions for the project.

Window

Posting Control

Related Window Descriptions

Posting Control

Procedure

Use the following procedure to enter information on posting control:

  1. Open Posting Control and find the posting types GP3, Capitalize Project Cost, and GP5, Calculated Project Costs.
  2. Enter information for each posting type. Note! Only code part A, Account, is allowed for the posting types GP3 and GP5.
  3. Save the information.
  4. Mark the row for code part A and select the Details operation, if appropriate. This opens Posting Control Details and you can enter detailed information for the control type.