Use this activity to change the cumulative lead time of a part. Changes in a part's routing or structure may require the recalculation of the lead-time information for that part. The lead time is not actually calculated; you simply enter it manually. The activity for calculating the lead time is found in Calculations/Cumulative Lead Time Calculation.
This activity requires that a part must have been defined with a routing.
As a result of this activity, the system changes the part's cumulative lead time in the inventory register.
Routings
Routings/Routings
Change Cumulative Lead Time