Add Indirect Time Result

Explanation

Use this activity to manually register a time result for indirect labor spent on an indirect job.

Prerequisites

System Effects

As a result of this activity an indirect labor transaction will be created.

Window

Time Card Day
Operation and Indirect Reports

Related Window Descriptions

Add Indirect Time Result
Operation and Indirect Reports

Procedure

To add indirect result:

  1. Right-click and click Add Indirect Result.
  2. In the Site field, enter the site or use the list of values to select the site on which the time should be registered.
  3. In the Indirect Job field, use list of values to select the indirect job on which the time should be registered.
  4. In the Date field, enter the date on which the time should be registered.
  5. In the Employee field, enter the employee on which the time should be registered.
  6. If applicable enter a team and a work center that the time should be registered on.

To add operation result:

  1. Right-click and click Add Operation Result.
  2. In the Operation ID field, enter the relevant operation identity or select a value by clicking List.
  3. Enter values in Labor Setup and Labor Run fields.
  4. Click OK.