Reschedule DOP Header
Explanation
Use this activity to automatically reschedule all the operations for an entire DOP
structure.
Prerequisites
This activity requires the existence of scheduled operations for the DOP structure. It
also requires a site connected to a Scheduling Server.
System Effects
As a result of this activity the system reschedules all operations for the DOP
structure.
Window
Schedule DOP Header
Related Window Descriptions
Schedule DOP Header
Procedure
- In the Site field, choose the site for which to reschedule a DOP structure. Use
List
to select from available sites.
- In the DOP ID field, specify the DOP header for which all operations are to be
rescheduled. Use List to select from available DOP headers for the site.
- To specify how you want the Scheduling Server to organize the orders, select one or more
of the remaining check boxes:
- Select Reassign Resources if you want the
Scheduling Server to allow operations to change resources.
- Select As Late as Possible if you want the
Scheduling Server to place the orders as close as possible to their given need date.
- Select Include Released Orders if you want the
Scheduling Server to reschedule shop orders with the status Released as well as those with
the status Planned.
- Select Compress Downstream from Bottleneck if you
want the Scheduling Server to try to keep the operations of any given shop order as close
as possible to the bottleneck resource.
- Select Refresh Materials if you want the
system to update
the Scheduling Server with the current material
availability profile for the parts required within the DOP structure.
- Select Refresh Project Information if you want the
system to update the Scheduling Server with project and project activity
related information for the site.
- Click
OK. The system now reschedules all operations
for the DOP structure.