Use this activity to manually send all buffered operation reporting messages to the Scheduling Server within a defined time interval.
This activity requires the existence of a site connected to a Scheduling Server. In the Scheduling Basic Data/Shop Order Scheduling/Buffered Operation Reporting tab, the Buffer Operation Reporting check box must be selected.
As a result of this activity the system sends all messages already submitted to the Scheduling Server.