Receipt with Multilevel Serial Structure

Explanation

Use this activity to report production performed with a serial-tracked part. A finished part or subassembly is produced, and the part is ready to be put into inventory. Before running the backflush, the serial numbers must be reserved for the components and the parent parts. The serial structure for the parent part also must be built.

Note: If the inventory part has the structure effectivity set to serial, only numeric values can be reserved as serial numbers. You cannot reserve serial numbers that already exist in Part Serial or are reserved on another order.

Note: Repetitive production only creates information for serial structures at the time of receipt. It will not use information for components that are not serial tracked, or components that are issued or backflushed earlier than receipt, such as at report points. There will be no as-built structures created.

Prerequisites

System Effects

Window

Production Receipt
Production Schedule by Line
Production Schedule by Line Part

Related Window Descriptions

Production Receipt
Production Schedule by Line
Production Schedule by Line Part
Production Receipt
Production Receipt Material
Production Receipt Reservation
Production Receipt Serial
Production Receipt Serial Structure

Procedure

From the Production Receipt window:

  1. Open the Production Receipt window.
  2. In the Production Line list, select the production line and part for which to report production.
  3. In the Sched Option list, select Scheduled or Unscheduled.
  4. In the Structure area, specify structure revision and the structure alternate. If desired, also specify the routing revision and the routing alternate.
  5. In the Backflush list, select Immediate Backflush or Defer Backflush.
  6. In the Location area, click in the Location No field, then click List to choose from different inventory locations. Next, type the quantity to receive in the Quantity Received field. If the part is catch unit enabled, then you have to enter the catch quantity received in the Catch Quantity Received field. 
  7. To change inventory locations, create a new record. Click in the Location No field, then click List to choose from available locations. In the Quantity Received field, type the quantity of parts to receive.
  8. Select the Edit Components check box to reserve serial components.
  9. Save. The Production Receipt Material dialog box will appear.
  10. In Production Receipt Material dialog box, select the serial component and click Assign. The Production Receipt Reservation dialog box will appear.
  11. In Production Receipt Reservation, click Create and select serial components. Save and then click OK when all the reservations for the component are finished.
  12. In the Production Receipt Material dialog box, click OK when all reservations are completed.
  13. In the Production Receipt Serial dialog box, reserve serial numbers for the parent part.
  14. To reserve nonconsecutive serial numbers, create a new record, then type the numbers in the Serial No column.
  15. To reserve a serial number range, click Create Interval. Create a new record, then specify the range in the From Serial No and To Serial No fields. To add a suffix and/or a prefix, type in the necessary characters in the Suffix and Prefix areas. Click OK.
  16. Change or connect the components with the specific parent part in the Production Receipt Serial Structure window.
  17. To add a component in the parent part structure, select the parent part in the tree structure. Select the component in the table on the right side and click Add to Structure.
  18. To remove a component in the parent part structure, select the component in the tree structure and click Remove Serial.
  19. Click OK to run the backflush.

 From the Production Schedule by Line window:

  1. Open the Production Schedule by Line window.
  2. In the Production Line list, select the production line for which to report production.
  3. Select the production schedule line for which to report production. Right-click and then click Production Receipt. The Production Receipt dialog box will appear.
  4. In Production Receipt, specify how many parts to report and receive into inventory in the Qty Reported field. The scheduled quantity is the default value.
  5. In the Sched Option list, select Scheduled or Unscheduled.
  6. In the Backflush list, select Immediate Backflush or Defer Backflush.
  7. In the Structure area, specify the structure revision and the structure alternate. If desired, also specify the routing revision and the routing alternate.
  8. In the Location area, select the Complete check box to create a complete production receipt.
  9. In the Location area, click in the Location No field, then click List to choose from different inventory locations. Next, type the quantity to receive in the Quantity Received field. If the part is catch unit enabled, you have to enter the catch quantity in the Catch Quantity Received field.
  10. To edit components, click Components. The Production Receipt Material dialog box will appear.
  11. In Production Receipt Material, select the serial component and click Assign. The Production Receipt Reservation dialog box will appear.
  12. In Production Receipt Reservation, click Create. The Inventory Part Location dialog box will appear.
  13. In Inventory Part Location, select a location. Click OK.
  14. In Production Receipt Reservation, select serial components. Save and then click OK when all the reservations are finished.
  15. Click OK in the Production Receipt Material dialog box, when all reservations for the components are completed.
  16. In the Production Receipt Serial window, reserve serial numbers for the parent part.
  17. To reserve nonconsecutive serial numbers, create a new record and type the numbers in the Serial No column.
  18. To reserve a serial number range, click Create Interval. Create a new record, then specify the range in the From Serial No and To Serial No fields. To add a suffix and/or a prefix, type the necessary characters in the Suffix and Prefix areas. Click OK.
  19. Change or connect the components with the specific parent part in the Production Receipt Serial Structure dialog box.
  20. To add a component in the parent part structure, select the parent part in the tree structure. Select the component in the table on the right side and click Add to Structure.
  21. To remove a component in the parent part structure, select the component in the tree structure and click Remove Serial.
  22. Click OK to run the backflush.

From the Production Schedule by Line Part window:

  1. Open the Production Schedule by Line Part window.
  2. In the Part No list, select the part for which to report production .
  3. Select the production schedule line for which to report production. Right-click and then click Production Receipt. The Production Receipt dialog box will appear.
  4. In Production Receipt, specify how many parts to report and receive into inventory in the Qty Reported field. The scheduled quantity is the default value.
  5. In the Sched Option list, select Scheduled or Unscheduled.
  6. In the Backflush list, select Immediate Backflush or Defer Backflush.
  7. In the Structure area, specify the structure revision and the structure alternate. If desired, also specify the routing revision and the routing alternate.
  8. Select the Complete check box to do a complete production receipt.
  9. In the Location area, click in the Location No field, then click List to choose from different inventory locations. Next, type the quantity to receive in the Quantity Received column. If the part is catch unit enabled, you have to enter the catch quantity in the Catch Quantity Received field.
  10. To edit components, click Components. The Production Receipt Material dialog box will appear.
  11. In Production Receipt Material, select the serial component. Click Assign. The Production Receipt Reservation dialog box will appear.
  12. In Production Receipt Reservation, click Create. The Inventory Part Location dialog box will appear.
  13. In Inventory Part Location, select a location. Click OK
  14. .
  15. In the Production Receipt Reservation dialog box, select serial components. Save and then click OK when the reservations for the components are finished.
  16. Click OK in Production Receipt Material when all reservations for the components are finished.
  17. In the Production Receipt Serial dialog box, reserve serial numbers for the parent part.
  18. To reserve nonconsecutive serial numbers, create a new record and then type the numbers in the Serial No column.
  19. To reserve a serial number range, click Create Interval. Click New, then specify the range in the From Serial No and To Serial No fields. To add a suffix and/or a prefix, type in the necessary characters in the Suffix and Prefix areas. Click OK.
  20. Change or connect the components with the specific parent part in the Production Receipt Serial Structure dialog box.
  21. To add a component in the parent part structure, select the parent part in the tree structure. Select the component in the table on the right side and click Add to Structure.
  22. To remove a component in the parent part structure, select the component in the tree structure and click Remove Serial.
  23. Click OK to run the backflush.