Disaggregate Family Plan

Explanation

This activity is used to disaggregate a family production plan to item production plans. The family production plans will be exploded through the planning bill percentages.

Prerequisites

To perform this activity, a production plan for the family level must exist.

System Effects

As a result of this activity, the disaggregation places the item production quantity in the option forecast at the item level.

Window

Disaggregate Level 0 to Level 1

Related Window Descriptions

Disaggregate Level 0 to Level 1

Procedure

You can execute disaggregate family plan either directly (Procedure A) or schedule the disaggregation by using New Database Task Schedule. (Procedure B).

Procedure A

  1. Open the Disaggregate Level 0 to Level 1 window.
  2. Select the site for which the family plans should be disaggregated. Use List to select from available sites. If you leave this field blank, all sites will be disaggregated.
  3. In the Part No field, specify for which part the disaggregation should take place. Use List to select from available parts. It this field is left blank, all parts will be disaggregated.
  4. If the part is a project master scheduled level 0 part, enter a value in the PNG field. Use List to select from available PNGs.
  5. In the MS Set field under Source Family Plan, select the master schedule set for which the family plan should be disaggregated. Use List to select from available sets.
  6. In the MS Set field under Target Item Plan, select the master schedule set you want to receive the disaggregated family plan. Use List to select from available sets.
  7. In the Run Date field, specify the date when you want to perform the disaggregation.
  8. Click OK.

Procedure B

Click Schedule and set the parameters in the New Database Task Schedule to schedule the disaggregate item production planning. A schedule task will be created once the setup is completed.