Evaluate Master Scheduling Level 1 Result Using Period Template

Explanation

This activity is used to evaluate the result of the level 1 calculation, using a period template.

Note: Periods on the period template depend on the work time calendar based on which the period template was generated. Therefore to view all data, a period template based on a calendar which has seven days for its schedule has to be used.

Prerequisites

This activity requires that the level 1 calculation of the selected part must have been performed.

System Effects

N/A

Window

MS Level 1 Part

Related Window Descriptions

MS Level 1 Part
MS Level 1 Part/View by Period
Select Period Template

Procedure

  1. Open the MS Level 1 Part window.
  2. Search for the part for which you want to study the results. To search for project master scheduled parts, use the project PNG.
  3. Click the View by Period tab to display the result of the level 1 calculation.