Use this activity to update the forecast for level 0. The forecast for level 0 was automatically transferred to level 1 when the calculation of level 0 was performed.
This activity requires that the calculation of level 0 must have been performed.
As a result of this activity, the system automatically updates the value created from the calculation of level 0.
Master Scheduling Level 1 Part
Master Scheduling Level 1 Part, Master Scheduling Level 1 Part/Register Forecast