Cost Build-Up per Structure/Routing/Cost Build-up

[To Costing]

Usage

Use this tab to study the cost of the selected structure and routing combination for the given cost set. You can study the associated cost buckets and their costs. Cost buckets with no line item number (or component part) are the level costs and the estimated material cost for the cost set of the selected structure and routing combination. Cost buckets with line item number (or component part) are the components and their costs are retrieved from the cost set that is used and the part cost. If the cost set does not have the cost information it will get the related costs for the particular component part from Cost Set 1. The sum of the costs shows in the bottom row refers only to the cost buckets with no line item number (or component part) since the component costs are accumulated to the above cost buckets.

Activity Diagrams

N/A

Activities

N/A