View Planned Stop
Explanation
Use this activity to view the stop events that are
planned to be executed in a production unit.
Prerequisites
N/A
System Effects
N/A
Related Window Descriptions
Production Unit
Procedure
- Select the required production unit from the
Overall Equipment Effectiveness navigator. The Production Unit
window opens with information for the selected production unit.
- Click the planned stop link (XX Planned Stops)
found in the lowermost section of the window. In the link name you will find
the number of planned stops defined for the production unit, e.g., 5 Planned
Stops.
- The Stop Event window will open with
information for a planned stop. Note: A list of all planned stop
records for the production unit will be displayed to the left of the window.
- To view another planned stop, click on the
relevant record in the list to populate its information in the
Stop
Event window.