Use this activity to create a new preventive maintenance action revision (PM action revision) from an existing revision.
A PM action revision that is in active status can only be updated with restriction if revision control is enabled and major changes such as entering new jobs, changing criteria associated with maintenance plan, changing maintenance organization, etc, cannot be performed. When major changes are required, a new PM action revision has to be created. If revision control is disabled you can make any changes to the same PM action without having to create new PM action revisions.
New revisions can be created from PM action revisions in Active and Obsolete statuses if there is no PM action revision currently in the Preliminary status.
A PM action revision in Active or Obsolete status should exist in the system, revision control should be enabled and a PM action revision in Preliminary status should not exist.
As a result of this activity, a new PM action revision is created. The revision will have the Preliminary status.
Separate PM Action
Route PM Action
Separate PM Action
Route PM Action
Create New Revision for PM