Elimination of PM Plan Lines
Explanation
Elimination percentage is used to eliminate maintenance plan lines that
are planned to fall due at approximately the same period in time when several PM
triggering mechanisms are used, such as a calendar trigger and a condition based
trigger. For example, if the PM falls due based on a condition based trigger
today, it is not necessary to generate a work order for a calendar that falls
due tomorrow. In other words, the percentage denotes at which maintenance yield
a maintenance plan line should be eliminated when another PM trigger will fall
due first. Elimination percentage can have a value between 50 and 100.
Lower elimination percentage means there is more chance of elimination of the
maintenance lines with close planned dates. On the other hand higher elimination
value means low chance of elimination of maintenance lines. Irrespective of the
calculated elimination value of the maintenance line/s, latter maintenance line/s are
eliminated if falling on the same planned date.
Prerequisites
At least two different maintenance plans generated from two different
conditions or calendar and condition should be there.
System Effects
As a result of this activity maintenance lines having an elimination value
higher than the one defined in General tab, Elimination At(%) field will
be eliminated.
Window
Separate PM Action
Route PM Action
Related Window Descriptions
Separate PM Action
Separate PM Action/Condition
Route PM Action
Route PM Action/Condition
Procedure
- Open either the
Separate PM Action
window or the
Route PM Action window.
- Create a new record (F5) or
query for an existing one (F3).
- Click the
General tab. Follow the appropriate steps:
For Calendar based generation:
- In the Start Value field, enter the time from
which you want the PM action (once generated) to be effective.
- In the Start Unit field, select the unit of
measure for the value entered in the Start Value field.
- In the Interval field, enter the time interval,
as to how often the work orders have to be generated.
- In the Interval Unit field, select the unit
of measure for the time interval.
- In the Valid From and Valid To fields,
enter the time range for which the PM action will be valid. These fields
can be used to limit the effectiveness of the PM action.
- In the Calendar field, enter a suitable work
time calendar. Use the List of Values to select a suitable value. The
PM plan lines of the PM
action will
be generated in accordance with the connected calendar.
For Condition based generation:
- Zoom the connected object and create a test point and accumulated type
parameter there.
- In the Condition tab, register a condition
using the test point and parameter created in the above step with suitable
start value and interval.
- Select the condition registered in the
step 2 and click right mouse button and select measurements.
- In the Measurements window, register at least two
measurements
- Go to the relevant background job execute it manually or wait till the
background job is completed.
Elimination of PM lines:
- Activate the PM Action.
- In the Elimination At(%) field, enter a value in between 50 and
100.
- Save the information (F12).
- Observe the elimination of Maintenance lines with close planned dates.