Use this activity to enter criteria required for event-based generation of PM actions. Event-based generation gives you maintenance with PM actions that occur at different times, depending on a certain event, e.g., revision, breakdown, etc. When you create a new maintenance plan with event-based generation, specify at what point in the event you want the maintenance plan to start. You can then specify an interval for how often you want to perform the PM action when the event occurs, for example, every other time.
Before the criteria is entered, the following must have been completed:
As a result of this activity, a maintenance plan for specified event will be created.
Separate PM Action
Route PM Action
Separate PM Action/General
Route PM Action/General
Use the following procedure to enter the information: