Perform MRP Network Report
Explanation
Use this activity to order a printout of the MRP results. The
report contains the system-generated proposals from the planning methods. If you do not
want to enter a specific selection criterion for the planning network, site, planner, or part number, enter
the percent sign (%). All output from the MRP sites, planners, or part numbers will be
displayed.
Prerequisites
The material requirements calculation must have been performed.
System Effects
As a result of this activity, the system creates an MRP report.
Window
Perform MRP Network Report
Related Window Descriptions
Perform MRP
Network Report
Procedure
- Open the
Perform MRP
Network Report window.
- In the
Planning Network field, enter the network for which you want to
perform the MRP network report. Click the List button
to select from the available planning networks. If you leave the field blank, MRP
network
report is run for all the planning networks to
which you have access.
- In the Planner field, enter a specific
planner code for printouts. If you want to process all planners enter the
percent sign (%) , or
leave the field blank.
- In the Commodity Group 2 field, enter a
specific commodity group code for printouts. If you want to process all
commodity groups, leave the field blank.
- Enter the specific part number
for which you want to
take printouts, in the Part No field. To process all the parts, enter
the percent sign (%) or leave the field blank.
- Select the appropriate part type from the
list.
- If you want to include the created orders, select
Yes in the Show Orders Created filed.
- If you want to include the changed orders in the
report, select Yes in the Show Orders Changed filed.
- If you do not want to create messages for phantom
part dependant demand, you can select the Don't create messages for phantom
part dependant demand check box.
- To execute
the perform MRP
network report, click OK.