Select Netting

Explanation

Use this activity to define that the default value for the DOP order (Netting) should be used. Later, when netting is performed, it is done in the following sequence:

The scope of the netting process can be specified as follows:

It is possible to perform re-netting when quantity and/or structure is changed after the release or after canceling existing netting relations.

Note: This release also supports a manual netting function that makes it possible to specify the target to be netted.

Prerequisites

This activity requires that part information must have been registered. Demand information must also have been registered.

System Effects

As a result of this activity, the system sets Netting to the default alternative when DOP orders are created.

Window

DOP Header
DOP Order

Related Window Descriptions

DOP Header
DOP Header/Detail
DOP Order
DOP Order/Detail

Procedure

  1. Select the DOP order to change.
  2. Click Netting from the Netting list, in the Settings area.
  3. Click Save.