Use this function to connect a Report Code to an Activity. The connected Report Codes in this window will be the only Report Codes that employees are able to use for reporting.
You can also use the Add Valid Report Codes wizard. You can read more about this wizard here.
Before connecting the Report Codes, they must be registered in Report Codes/Report Codes
As a result of this entry, it is possible to start registering time and costs on the Report Codes.
Project Navigator/Valid Report Codes