This activity is used to register basic data
about the report code, such as invoicability etc. You can also specify whether cost accounting should be created
and if used cost should be updated on the project activity when this report
code is used in a project transaction. If you choose not to create cost
accounting, you can specify whether or not the used cost should be updated for
the transactions without creating cost accounting.
Note: The create cost accounting option can be specified for a project in
the Project/Project PrePosting tab. Therefore, when
transactions are created for a project activity, the create cost accounting
option specified for the project as well as the report code will be considered.
The report codes are required to be registered in the Report Codes/Report Codes tab.
As a result of this entry, the report code can be connected to an activity.
Report Codes/Report Code Details