Confirm Proposed Schedule

[About Production Line Management] [About Production Schedule Load Methods] [About Proposed Production Schedule]

[To Repetitive Manufacturing]

Usage

Use this dialog box to confirm a proposed schedule as the new active production schedule for a line. You must select the production line, and optionally a specific part, and a schedule date range which you want to copy. You must also specify whether you want to replace the existing schedule or add to it.

Activity Diagrams

Production schedule management

Activities

Confirm proposed schedules