Edit Control Plan
Explanation
Use this activity to edit the control plan lines displayed
in the
Shop Order window. This optional task is to be performed by
production engineers or production planners.
- You can add new control plan lines, or
subsequently delete the newly added control plan lines. An existing
analysis will not be updated with the changes made to control plan lines.
- Any changes made to the control plan in the
Shop
Order window will only affect that specific shop order.
- You can edit the shop-order-specific control plan lines
as long as the shop order is not in the Closed status.
- It is possible to make multiple changes to the
control plan.
This activity contains a Security Checkpoint which can be activated by an
administrator. With an activated security checkpoint on a function you will have
to authenticate yourself again in order to fulfill the function. Additionally,
whenever a security checkpoint is successfully passed a security checkpoint log
is written, creating an audit trail of what is done.
This activity contains a security
checkpoint which can be activated by an administrator. With an activated
security checkpoint on a function it is necessary to authenticate the user again
in order to fulfill the function. Additionally, whenever a security checkpoint
is successfully passed, a security checkpoint log is written creating an audit
trail of what is done.
Prerequisites
A Control Plan for Manufacturing in Active status
must exist for the part or shop order.
System Effects
As a result of this activity, the control plan used for
a specific shop order can be modified.
If a control plan is modified, the Modified By and
the Modified Date fields will display the name of the user who modified
the record and the date on which it was performed respectively.
Window
Shop Order
Related Window Descriptions
Shop Order/Control Plan
Shop Order-Control Plan/Control Plan Line
Shop Order-Control
Plan/Shop Order Analysis
Analysis Results
Overview-Analysis Shop
Order
Procedure
- Open the
Shop Order window.
- In the Part No field, query for the part
number for which you want to edit the control plan lines, or select a part
number from the List of Values.
- Click the
Control Plan tab.
- If you want to add new control plan lines, select New
and enter new data points.
- If you want to include data points when creating an
analysis, select the Included check box.
- Save the changes.
- In the header section of the
Control
Plan tab, right-click and click Approve Modifications.
- Under Control Plan Attributes, the value in the Modification Status field
will be changed to Approved.
- The values in the Approved By and Approval
Date fields will appear automatically.
- If you want to add additional information, in the header section of the
Control Plan tab,
right-click and click Notes.
- Include the information in the text editor. The Note
Text check box will be selected.
- To undo all the modifications, in the header section of the
Control Plan tab,
right-click and click Revert to Original.
- The Modified check box will be cleared, and
the Modification Status, Approved By, and the Approval Date fields
will be Null.