Condition Monitoring Program/Instructions/Material Usage

[About Instructions and Subtasks] [To Manage Maintenance Program]

Usage

Use this tab to define materials for an existing instruction (operation). When a condition task is due and includes instructions (operations) and connected materials that are registered for the condition limit, the said operations and material lists will be transferred to a work order once distributed. If predefined instructions have been entered for the condition limit, thee material will be displayed in this tab.

Activity Diagram

Define Instructions

Activities

Define Material for Instruction and Subtask
Define where Instructions should be used