Change Part Revision (Step 1 of 4)

[About Serial Part Revisions] [About Serial Structures] [About VIM Access Control] [To Perform Maintenance Engineering] [To Manage Serialized Configuration] [To Manage Line Maintenance] [To Dispatch Asset and Close Maintenance Visit]

Usage

Use this step of the Change Part Revision assistant to enter a new part revision for the selected serial part.

Activity Diagrams

Maintain Serial Structure

Activities

Change Part Revision