Maintenance Order/Exec. Logic

[About Maintenance Order] [About Pending Task] [About Work Order] [To Prepare Maintenance Visit]

Usage

Use this window and its tabs to view and maintain the Execution Logic Structure (ELS) for the maintenance order.

This window is divided into two parts:

The topmost node in the graphical object structure represents the maintenance order for which the ELS was created. Below that grouping nodes corresponding to the grouping criteria defined on the ELS template will be displayed. The grouping nodes can be found on one or more levels depending on the grouping criteria. Note that it is also possible to define grouping criteria without any grouping nodes. The grouping nodes are indicated by the sign. The corresponding ELO node will be displayed on the level below. Note that only one ELO node will be created at the lowest level grouping nodes. The ELO nodes are indicated by the sign. The Ungrouped Operations node will be created automatically when there are task operations that do not fit into any of the defined ELOs or if the valid ELOs have already been completed. These ungrouped operations as well as operations that are already grouped will be defined at the lowest level of the structure. The operations are indicated by the sign.

In the graphical object structure you can:

For the description of each tab in the window, follow the appropriate link: Exec. Logic Structure, Gantt, Material Required, Demand Roll Up.

Activity Diagrams

Maintenance Visit Inspection

Activities

Move Operation within Execution Logic Structure