Connect Work Order

Explanation

Use this activity to connect one or several existing work order to a parent work order.

Prerequisites

Before the work order is connected to the parent work order, the following must have been completed:

System Effects

As a result of this activity, a work order structure is created. All work orders connected to a parent work order have to be completed before the parent work order status is changed to 'Finished'.

Window

Prepare Work Order

Related Window Descriptions

Prepare Work Order

Procedure

Use the following procedure to connect a work order to a parent work order:

  1. In Prepare Work Order, find the parent work order, and use the Structure operation. 
  2. In Structure for Work Order, use the New function in the lower part of the window.
  3. In the WO No. field, use List of Values to select the work order that is to be connected.
  4. Save the information.