Report In Measurements
Explanation
This activity is used to record the values obtained during the measurement of
an object.
Prerequisites
- The work order should exist on the mobile device running IFS Mobile Work
Order.
- A test point and a parameter should have been linked to the object in
the Serial Object
or Functional
Object window in IFS/Equipment.
- The object and parameter criteria should be synchronized with the mobile
device.
System Effects
- A measurement record is created.
- An object parameter gets
updated with the last measured value.
Window
The mobile device on which IFS Mobile Work Order is installed.
Related Window Descriptions
Refer the help for IFS Mobile Work Order on your device.
Procedure
Setup Meter:
- On the Measurement Screen, long press and select Setup/Change Meter,
from the actions menu on a parameter which does not have a meter connected.
- In the Set up Date field, enter the date at which the meter is
setup.
- In the Meter ID field, enter the identity of the meter.
- In the Roll-over Value field, enter the value at which the meter
re-sets.
- In the Note field, enter a suitable description of the meter
setup
- Tap OK.
Change Meter:
- On the Measurement Screen, long press and select Setup/Change Meter,
from the actions menu.
- In the Set up Date field, enter the date at which the change is
done.
- In the Meter ID field, enter the new identity of the meter.
- In the Start Value field, enter the value at which the new meter
starts.
- In the Roll-over Value field, enter the new value at which the meter
re-sets.
- In the Note field, enter a suitable description of the meter
setup.
- In the End Value field, enter the last value of the old meter.
- Tap OK.
Enter Measurements:
- On the Home Screen, tap Measures. Alternatively, you can record
the measurements as part of the work order flow. To do this, tap on the
required work order, on preview screen long press and tap Measures Or navigate to the
WO Actions screen , and then tap
Measures.
- Tap on the object for which you want to report measurements.
- Select the parameter and/or test point for which you want to record a
measurement. This can be done by tapping on the arrows in the header or by
long-pressing the screen and tapping Find Test Point or Find
Parameter.
- In the Value field, enter the measured unit value.
- In the Date field, enter the date at which the measurement is
recorded.
- Optionally, enter additional information in the Note field.
- Tap Save.
- Observe, the entered measurement is displayed under Last Reading
section in the same screen.
- Report in measurements for a different parameter, if needed.
Handle Preliminary Readings:
- On the measurement screen, long press and select Measurement History.
- Select the reading in state Preliminary from the history records and
long press.
- Select Mark As Incorrect.
- In the Note field, enter a description.
- Tap OK.
- Go back to Measurement History screen and observe that
Preliminary reading is set to Incorrect reading.
Set Meter Roll-Over Value:
- On the measurement screen, long press and select Set Meter Roll-Over
Value.
- In the Value field, enter new meter roll-over value.
- Tap OK.