Select Period Template and MS Set to Group Level 1 Data

[About Master Production Schedule Level 1] [About Manual Update MS Level1] [About Rules for Master Scheduling Level 1]

[To Master Scheduling]

Usage

Use this dialog box to select the period template ranges and master scheduling (MS) set to be used in the Master Scheduling for Multiple Parts window.

Activity Diagrams

Perform MS level 1

Activities

Manually update level 1 master schedule parts