Resource Capacity Summary Graph

[About Resources] [To Project Management]

Usage

Use this window to view the results of a resource capacity calculation. The graph can display all periods or a user-selected set of periods for a resource group. For each period, five parameters are shown:

  1. Used normal capacity

  2. Normal capacity limit (displayed as a line)

  3. Overload normal capacity (the excess of normal capacity, but when it is below max capacity)

  4. Max capacity limit (displayed as a line)

  5. Overload max capacity (the excess of max capacity)

The x-axis shows the periods while the y-axis shows the hours. When clicking directly at a bar, you receive detailed information about that specific period, with a listing of the activities and their contributions to the resource usage. See: Resource Capacity Summary Graph/Resource Period Detail for more information.

Activity Diagrams

Plan and Assign Resources
Forecast and Assign Resources

Activities

Plan Resource Capacity