Use this window to create a work guideline for an operation. If the guideline is of type Subtask, the subtask can be signed off and/or inspection signed off by right-clicking and then clicking Sign Off or Inspection Sign Off.
Add work guideline to
shop
order
Sign off
Inspection sign off