Enter Modification Execution Information (Step 5 of 6)

[About Historical Data] [To Manage Serialized Configuration] [To Perform Maintenance Engineering]

Usage

Use this step of the assistant to enter information on the preventive checks for the selected modification. Values for the current and new execution type of the modification appear in the Change Execution Type area. The current execution type is used for the selected serial part and modification, and appears automatically from the tab the assistant is opened. The current execution type can only be changed to a higher execution type than the present value. 

The new execution type will be used when you want to raise future preventive checks to a higher level or embody the modification. This execution type will be used subsequently when the modification is applied to a selected serial part. Select a value for the new execution type that will be validated as a higher value than the current execution type. The new execution type must have a higher value than the current execution type.

To terminate inspections of a modification, select the Terminate Inspections check box. Terminating inspections implies that no further initial or continued inspections will be carried out for the particular serial, and the modification will not be complied with.

When finishing the last of the current inspection type without specifying the New Execution Type and with the Terminate Inspections check box not selected, the system will shift to the next execution type.

A description of the modification execution should be entered in the Mod Execution Remark field. The recorded date is the date that the selected modification was complied (or not complied) with, this value defaults to the recorded date entered in the Component Life window.