Define Modification/Assign Parts
Assigned Parts

[About Modification Definition] [To Manage Maintenance Program] [To Define Templates and Modifications] [To Manage CRO Request]

Usage

Use this window and tab to define the part numbers for which the modification is applicable. The data in this window and tab can only be updated when the modification is in the Preliminary status.

It has to be decided whether the modification should be executed at next visit in workshop, at next interval maintenance, or at a calculated time based on the defined operational parameter(s) or calendar interval. This is determined by the values in the Next Visit In Workshop and Next Interval Maintenance fields. If you want the last due date to trigger the execution, select the Last Due Date Trigger Execution check box. Observe the following examples:

When the modification revision is set to the Active status, the serials with part numbers listed in this window and tab will be assigned to the modification. If the assignment type of the modification is By Revision All Serials, only serials with the parts revisions listed in the Assign Part Revisions tab will be assigned. However, if the assignment type of the modification is By Serial Range, the serial numbers defined in the Serial Range tab will be assigned.

Note: If the assignment type of the modification is Documentation the Define Modification/Assign Parts tab will not be enabled.

Activity Diagram

Define modification
Define MRO manufacturing operational data

Activities

Define Modification Part Records
Assign Parts to Modification
Copy Inspections and Terminating Actions